View Single Post
  #4  
Old 01-18-2011, 12:58 PM
Bigsmc's Avatar
Bigsmc Bigsmc is offline
Goodwood
 
Join Date: Jun 2006
Posts: 8,577
Default

I would think most tracks add sand after a sustained period of heavy rain. 300 to 500 tons is not that much considering the size of the main track. Spread evenly, I would think 300 tons would equate to about 1" of sand over the whole track (assuming 80' width and no chutes), if my math is remotely correct.

Obviously, I oversimplified it, I'm sure they would concentrate on the bad spots and would not be spreading it evenly throughout.
Reply With Quote