Yeah it was a MAJOR storm. 10 minutes of thunder and lightning.
You can thank the tightwads at Churchill for not installing decent generators. Mr. Geary is doing a great job but Rome wasn't built overnight. To make matters worse the power is being leased from Vectren in Evansville until repairs on the twin bridges are over.
That's the second time in the past two months that Ellis has lost power.